shaft system of unit 机组轴系
The thermal system of HRSGs is introduced for a 700MW-class combined gas-steam cycle unit with multi-shaft arrangement in present paper.
介绍了一套700MW级多轴布置的燃气-蒸汽联合循环机组及其余热锅炉的热力系统。
By a mounting example, the problems existed in unit mounting and shaft system alignment of coupling are analyzed and discussed.
通过一个安装实例,分析探讨了联轴器在机组安装时的轴系对中问题。
It is a critical task need to be solved urgently that the skip loading system for vertical shaft without measuring pocket should be equipped with quantitative loading unit.
无定量斗立井箕斗式装载系统加装定重装载装置是煤矿亟待解决的重要课题。
应用推荐