It was theorized with a high degree of probability that the change in period was due to the nonlinearity of the hydrodynamic pressure acting on the upstream face of the dam.
据推论最大可能性是在那一时间段非线性水压作用于坝体上游面所造成的差别。
There were 20 cracks at upstream face dam head of Huanren dam during construction which threatened dam safety.
桓仁大坝上游面施工期发现严重的劈头缝20条,威胁大坝安全。
The concrete crushing type sidewall technology is a new method for constructing the upstream side slope of concrete face rockfill dam.
混凝土挤压式边墙技术是混凝土面板堆石坝上游坡面施工的新方法。
应用推荐