water power project 水力发电工程
water and water power project 水利水电工程
water and power project 水利水电工程
water power station project 水电枢纽工程
In the Process of developing and utilizing water-power project, there are many uncertain factors, which are the risk.
在水电项目建设过程中存在许多风险因素,对项目成败起着至关重要的作用,因此水电项目建设风险因素的识别、分析及评价是十分重要的。
参考来源 - 水电项目风险管理评价研究·2,447,543篇论文数据,部分数据来源于NoteExpress
The main structure of the Three Gorges project consists of the water impounding dam, flood releasing installations, power plants, and navigation facilities.
三峡水利枢纽主要由拦河大坝及泄洪建筑物、水电站、通航建筑物组成。
At present the large diameter slurry pipe jacking is the preferred construction method in project of urban water supply and drainage pipe and electric power pipe.
目前,大直径泥水平衡顶管掘进已成为城市给排水水管、电力管线工程等首选的施工方法。
The author briefly introduces the purpose and necessity of calculation of loan capability for water and power project.
简述水利建设项目进行贷款能力测算的目的和必要性,介绍贷款能力测算在巴江口水电站中的应用。
应用推荐