The author briefly introduces the purpose and necessity of calculation of loan capability for water and power project.
简述水利建设项目进行贷款能力测算的目的和必要性,介绍贷款能力测算在巴江口水电站中的应用。
The main structure of the Three Gorges project consists of the water impounding dam, flood releasing installations, power plants, and navigation facilities.
三峡水利枢纽主要由拦河大坝及泄洪建筑物、水电站、通航建筑物组成。
An structure analysis in columnar power house of Extension Project of Dahua hydropower station is made by 3d element program and considering three different water levels.
对大化水电站扩建工程的圆筒式厂房,在3种不同水位下,通过三维有限元程序,进行了结构分析,结果表明圆筒结构合理。
应用推荐