引红济石越岭隧洞TBM法施工工程地质条件评价及对策王飞_建筑工程管理论文 关键词: 越岭隧洞, TBM法施工,岩溶,涌水 [gap=462]Keywords: servants tunnel, TBM construction method, karst, water gushing
基于32个网页-相关网页
Flooding was caused by water gushing into rivers from uplands.
从山地奔流而下的水涌入河中引发了洪水。
So, the research of water gushing to Malu after entering the underground has important realism meaning.
因此,对矿段延深进入地下后的涌水进行研究具有重要的现实意义。
The research of underground water gushing is a very important topic in the production after entering the deep mine.
矿床进入深部开采后,地下涌水的研究是生产中一个十分重要的课题。
应用推荐