We are now ready to trace these costs through Work in Process and Finished Goods to the Cost of Goods Sold account.
现在就可以跟踪这些成本,通过在制品和制成品账户转至销货成本账户。
You must redesign process and job roles to take advantage of any cost savings in the form of some labor elimination or to take advantage of any productivity savings with redirected work.
你必须重新设计流程和工作角色,以利用表现为某种工作消除的任何成本节省或利用带有重定向工作的生产力节省。
The operating responsibility of logistics is the geographical repositioning of raw materials, work in process, and finished inventories where required at the lowest cost possible.
经营责任的物流是地理复位的原料,在工作过程和成品的库存情况下,需要在最低的成本可能。
应用推荐