... non-working slope face 非工作边帮面 working face pressure 工作面矿压 hot working face 热工祖 ; 高温工作面 ...
基于8个网页-相关网页
By using field observation and numerical simulation method, the influence of fracture structure plane on the underground pressure and the roof stability of working face are systematically studied.
通过对现场观测和数值模拟分析,系统研究了断裂结构面对回采工作面矿压分布和顶板稳定性的影响。
The lag distance of abutment pressure behind working face increases, but the convergence coefficient of vertical stress doesn't change obviously with the increase of mining height.
分层开采与综放开采工作面滞后支承压力变化规律是,随着采高的增大,工作面滞后支承力的距离加大,垂直应力集中系数差别不大。
Seal chamber pressure of a new double spiral groove face seal working under high velocity and pressure conditions may probably be disturbed in operation, which affects the seal stability.
一种用于高速高压等极端工况下的新型双螺旋槽端面密封在实际运行过程中密封腔压力会出现波动,从而影响密封稳定性。
应用推荐