One preparation workshop building area of 2,800 square meters, construction of the test area of 800 square meters.
其中制剂车间建筑面积2,800平方米,中试车间建筑面积800平方米。
The construction solve the problems such as building surface dusting and cracking, opening leakage, thus raising the lifespan of the workshop.
施工后解决了楼面面层起砂开裂、缝隙渗漏问题,可提高厂房的使用寿命。
The construction had begun with the demolition of an outdoor workshop on the south side of the Architecture building.
建筑馆南侧室外工作室的拆除标志着建设的开始。
应用推荐