In this case, the transition from manual to auto mated control would take place on the entrance ramp.
在这种情况下,从手动到自动匹配控制的过渡将在入口坡道上进行。
This paper points out that the integrated problem of entrance on ramp control, mainline control and corridor control must be studied in order to solve traffic jam of freeway effectively.
本文指出要有效解决高速公路的交通拥挤与堵塞问题,必须研究入口匝道控制、主线控制、通道控制等的集成问题。
应用推荐