From the construction of an asset to its final decommissioning, Hydratight provides joint integrity solutions at every stage of the lifecycle of an oil and gas facility.
从资产建造到最终停运,海卓泰特在石油天然气设备生命周期的各个阶段都能提供连接完整性解决方案。
Total active pipeline data includes projects in the construction, final planning and planning stages, but does not include projects in the pre-planning stage.
所有活跃市场数据包括在建项目,筹备阶段或最后筹备阶段的工程,但是不包括处于前期策划中的项目。
For cost control in main stage construction, three aspects are expected to be in deep-depth study: the bidding phase, the construction phase, the phase of final acceptance.
对施工阶段造价控制主要从三个方面进行深入研究,即招投标阶段、施工阶段、竣工验收阶段;
应用推荐