To fit the complexity and particularity of different hydropower projects, methodology of object-oriented simulation was introduced to dynamic simulation for high arch dam construction processes.
为了建立通用的高拱坝施工仿真模型,以适应不同水电工程的复杂性与特殊性,在高拱坝施工全过程动态仿真中引入面向对象的仿真方法。
Ertan arch dam is the typical module of high hyperbolic arch dam, whose design method and technique has been widely used in the construction of large-scale hydraulic power plants recently.
二滩拱坝是双曲高拱坝的典型代表,近年来其设计理念、方法被广泛用于国内大型水电枢纽的建设。
Through the comparison the three center single arch dam was finally selected, thus high speed construction of the roller compacted concrete can be put in practice.
通过比选最终确定为三心圆单曲拱坝,坝身不布置泄洪建筑物,从而实现了碾压混凝土的快速施工。
应用推荐