Due to low soil strength, high underground water level and strong soil plasticity flow, unstability accidents happened frequently in soft soil area.
软土地区由于土体强度低,地下水位高,流塑性强,基坑失稳事故频发。
The high level underground water causes damages on the concrete board of the canal such as seep, freezing, sulfate erosion and swelling by swelled ground.
由于地下水位高,造成地下水对渠道混凝土板的渗透破坏、冻胀破坏、硫酸盐侵蚀破坏和膨胀土膨胀破坏。
The diversion tunnel section excavated by tunneller is buried deeply, the under ground water level is high, the activities of underground water is lively, and Karst topography is quite developed.
采用掘进机开挖的引水隧洞洞段埋藏较深,地下水位高,地下水活动强烈,岩爆频繁,岩溶较为发育。
应用推荐