The article discussed the identification of hazards and proposed control measures for hazards in construction site of tunneling face.
本文探讨了岩巷掘进施工现场重大危险源的辨识、评价、确定,提出了施工现场进行重大危险源的管理控制措施。
The organization shall establish and maintain procedures for the ongoing identification of hazards, the assessment of risks, and the implementation of necessary control measures. These shall include.
组织应建立并保持程序,用来开展危险源辨识、风险评价和实施必要的控制措施,这些程序应包含。
Control of risk exposures to an acceptable level depends on the identification and evaluation of the hazards with reference to acceptable exposure standards and or specifications.
要将它们控制在一个可接受的水平,就需要根据暴露标准和规范对危害因素进行识别和评估。
应用推荐