... Indirect Project Cost 间接项目成本 indirect labour cost 间接劳务费用 ; 间接劳动力成本 IMC Indirect Maintenance Cost 间接维修成本 ...
基于136个网页-相关网页
And indirect cost of the project management and supervision.
而对工程造价进行间接的管理和监督。
Making use of the relations among the direct cost, the indirect cost and the total cost, we get the best time limit for the project with results of the optimal T-C decision-making.
利用直接费用、间接费用与总费用的关系,预测出总费用最低时对应的工期,从而给出了工期一费用的最优决策。
Under the support and instruction of mbb work out the six sigma annual oe plan including6sigma project lean workshop project direct cost saving and indirect cost saving.
在黑带大师的支持下,制定年度六西格码和精益生产成本节约计划。
应用推荐