... initial collapse pressure 初始湿陷压力 initial pore water pressure 初始孔隙水压力 instantaneous pore pressure 瞬时孔隙压力 ...
基于8个网页-相关网页
It can be seen that the initial maximum pore water pressure takes place in the lower soil due to the load transformation from pile cap to soil.
研究结果表明,打桩后桩体所受荷载向下传递,地基中的初始最大孔隙水压力出现在桩端以下土层。
Arbitrary initial pore-water pressure distributions and flux boundary conditions are considered in the analytical solution.
此解析解考虑了任意初始的孔隙水压力分布和流量边界条件。
应用推荐