The ironmaking is the first important process in iron and steel production, and the distributor chute is a major component of non-bell top blast furnace.
炼铁是钢铁生产的第一个重要环节,高炉布料溜槽是无料钟炉顶高炉的布料装置,也是高炉中的一个重要部件。
The batch on-line scheduling problem is presented from the production of iron and steel plant, which is a main part of MES in process industry.
从钢铁生产热轧流程中提炼出了在同构并行机上的批在线调度问题,它是流程工业中MES的重要环节。
This text briefly introduce the emission of CO_2 in iron & steel making process, and it emphasizes the CO2 production and emission status of important energy consumption part of iron-making process.
本文简要介绍了钢铁生产各工序的CO_2排放情况,着重阐述了钢铁生产重要耗能部分——铁前系统的CO_2产生及排放现状。
应用推荐