On the basis of the peculiarity and problems in tunnel engineering, the paper expatiates on the necessity and significance of tunnel engineering contract programming in tunnel project management.
本文基于隧道工程建设中存在的问题,同时在隧道工程特点分析的基础上,阐述了合同策划对隧道工程项目管理的重要性和意义。
The change of project refers the changes of contract caused by the modification of design document or technical specifications, which has great impact on the work of project cost management.
工程变更是指由于设计文件或技术规范修改而引起的合同变更,它对工程造价管理工作有较大的影响。
Effective contract management plays a vital role on improving project quality, reducing project construction cost and time.
搞好合同管理,对提高工程质量、降低工程造价和缩短建设工期有重要的意义和作用。
应用推荐