The truck's load was over the limit allowed on the bridge.
这辆卡车的负载量超出桥的载重限制。
Shunt reactor could be installed in the middle segment of the UHV transmission line, in order to compensate capacitive current of transmission line and limit over-voltage of line without load.
特高压长线路可能在线路中间接入并联电抗器,从而有效补偿线路电容电流,抑制空载线路过电压。提出了在特高压长线路中间带并联电抗器时的线路分相电流差动保护原理。
应用推荐