The construction condition, technology and procedure for steel pipe concrete pile supported by anchor foundation at the north, Renyang Bridge and the quality detection are introduced in the paper.
简要介绍润扬大桥北锚碇基础支撑钢管混凝土桩的施工条件、施工工艺和施工过程以及质量检测。
Abstract:The paper compares the cost performance of four practice of wall fastener by value engineering principle, such as embedded pipe, embedded steel bar, embedded steel plate and after the anchor.
摘要:采用价值工程原理,比较预埋钢管法、预埋钢筋法、预埋铁板法、后锚固法的连墙件性价比。
The process of emergency reinforcement with unloading and steel pipe pile jacked by anchor bolt was introduced.
介绍了该工程采用卸载和锚杆静压钢管桩相结合的抢险加固过程。
应用推荐