...Open Shop) 绩效衡量:总时程(Makes pan)、总流程时间(Flow Time)、延迟时间(Tardiness)、 延迟与提早(Tardiness and Earliness) 2..
基于1个网页-相关网页
The objective is to determine the optimal due-date and schedule simultaneously to minimize the completion time, earliness and tardiness penalties.
目标函数是使完工时间,提前完工时间和误工时间的加权和最小。
In this paper, interval Numbers symbolize uncertain process times and the optimum objective is to minimize the weighted sum of penalty possibility for jobs due to earliness or tardiness.
本文对不确定加工时间用区间数来表示,以工件提前或者拖期遭受惩罚的可能性的总加权和最小作为优化目标。
All jobs have common earliness cost and common tardiness penalty, but the window location with linear cost is a decision variable.
公共交货期窗口大小给定但位置待定,由线性定位费用衡量;
应用推荐