This paper presents sand and cobble foundation treatment of overflow dam, guide wall and overflow weir by "high pressure jet grouting" at an in Hydropower Station.
本文主要介绍应用“高喷”技术对安居水电站溢流坝、堰坝导墙、溢流堰天窗沙卵石基础处理的方法和体会。
This paper introduces the treatment for deep dam foundation of the concrete cut off wall, which intensity and elastic modulus value are requirement to satisfy the stress, strain and durability.
本文介绍了砼防渗墙对土石坝深厚覆盖层地基的处理,强调防渗墙砼强度及弹模取值应在满足应力应变的前提下,兼顾耐久性等要求。
The rock foundation of the dam of the Dahua Hydro-project was relatively poor, however, both the uplift and water leakage under the dam are fairly low after a comprehensive foundation treatment.
大化水电站大坝基础岩石虽较差,但基础处理采取综合处理措施后,坝基扬压力及渗漏水量均较小。
应用推荐