Second water supply project 二次供水项目
Secondary water supply project 二次供水项目
Gongming Water Supply Project 公明供水调蓄工程
Chaozhou Water Supply Project 潮州供水枢纽
Jiaonan Water Supply Project Corp 胶南市自来水供水工程公司
western urban water supply project 西部城市居民供水项目
second period water supply project 二期供水
The main objectives of the project are to improve water supply in Changchun to meet the domestic needs of the urban population, support industrial growth, and control urban water pollution.
本项目的主要目标是改善长春市供水条件,满足城市人口生活用水需求,支持工业增长,控制城市水污染。
Water Supply Rehabilitation project (1988-1999) —$22.3 million.
供水设施改造项目 (1988-1999) ,世行贷款2230万美元。
This paper presents the layout and test results of Xixi Junction of the Chaozhou Water Supply project which have been adopted in the design and construction of the project.
介绍潮州供水枢纽工程的西溪枢纽布置和试验研究成果,该试验研究成果已被工程设计和施工的采用。
应用推荐