• 路基山区公路建设中遇到特殊路基形式

    The cliff debris subgrade is a special type of subgrade in mountainous highway construction.

    youdao

  • 路基土石方工程包括:填方路基挖方路基特殊路基处理及其有关的作业。

    Subgrade earthwork and rockwork shall include: fill subgrade earthwork, cut subgrade, special subgrade treatment and other relevant activities.

    youdao

  • 通过对太佳高速公路一般路基特殊路基防护排水设计进行分析介绍提出一些设计思路想法大家参考和探讨。

    The paper analyzed the design of common subgrade, special subgrade, protection and drainage etc. in Taijia Expressway, and proposed some design thoughts and ideas for reference.

    youdao

  • 有种特殊工具可以道路修筑过程中将路面压紧,因此路基结实的。

    There is a special tool to impact the road when it is under construction so the base is solid.

    youdao

  • 黄土我国西北地区广泛分布一种特殊西部地区大规模公路建设中,黄土常常用于路基填料地基土。

    Loess, a special soil widely distributing in northwest area of China, is often used as road foundation filling element and foundation soil during the large-scale highway construction of this area.

    youdao

  • 只要没有隧道其他特殊建筑路基可以堤上

    Unless there is a bridge, tunnel, or other special structure, this roadbed is constructed of in-situ soils or on earth embankments.

    youdao

  • 粘性路基施工,有特殊技术要求,笔者具体施工方法参数选定作了详细介绍。

    According to the special technology request of the roadbed of viscous soil construction, this article mainly talks about the choice of the method of construction and the parameters in detail.

    youdao

  • 黄土是一种特殊黏性土,叙述黄土特性黄土地区修筑高等级公路路基工程施工的特点,结合实际提出了施工注意要点质量保证措施

    The paper introduced the characteristics of loess and the construction in loess area, and combined with the practice, it proposed attentions and quality control measures.

    youdao

  • 岩盐路基施工特殊路基施工。

    Rock salt highway subgrade construction is a special construction method.

    youdao

  • 针对加固河套地区特殊不良路基地基的应用技术研究,阐述了将风积沙用于路基不良地基的加固处理技术。

    This article describes the application technology for consolidating the special poor subgrade in the Hetao Area with wind-blown sand.

    youdao

  • 冻土具有极为特殊工程地质性质,修建路基不可避免地发生变形甚至是破坏

    Due to special engineering geological characters of the permafrost, it is inevitable for the embankment above the permafrost to come into being deformation, even failure.

    youdao

  • 公路路基建设工程,常会遇见溶洞地下暗河特殊地质情况

    Special geological conditions including karst cave, flow sand seam and underground river are encountered during construction of railway and highway engineering.

    youdao

  • 公路路基建设工程,常会遇见溶洞地下暗河特殊地质情况

    Special geological conditions including karst cave, flow sand seam and underground river are encountered during construction of railway and highway engineering.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定