Each of the reactors will be a small, modular, 125MW advanced lightwaterreactor, which at the present time includes a design for the nuclear core and steam generator to be located at the same site, with passive safety designs.
But disputes, like the current argument about whether North Korea gets a light-water reactor as part of a deal for dismantling its weapons program, have happened before, and as of now the six-party negotiations scheduled to resume in November appear to be still on.