Because of the current lack of real-time monitoring and controls, system operators often insist that utilities run just 50% of the maximumload through their wires.
Eighteen seconds later, you have slowed that aircraft to hover speed and can sit down in the landing zone to quickly on- or off-load the maximum things on the aircraft.