• Earlier this week it rejected plans for two wind farms at Pentre Tump, near New Radnor, and Mynydd-y-Cemmaes near Llanbrynmair.

    BBC: Powys wind farms: Council faces ?2.8m public inquiry bill

  • The stand is the last part of the ground to be redeveloped after two new all-seater stands were built at the Worcester Street end in 2004 and the old grandstand side in 2007, the old "Tump" end was redeveloped as a terrace with executive boxes above it for the 1991 World Cup.

    BBC: Walkinshaw reveals plans for Shed

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定