• The mobile assignment was based on the transmit power of the link as well as cell load in the up link and down link calculation of base station location planning.

    基站布局规划上、下行链路计算基于链路发射功率小区负载进行移动台分配

    youdao

  • The mobile assignment was based on the transmit power of the link as well as cell load in the up link and down link calculation of base station location planning.

    基站布局规划上、下行链路计算基于链路发射功率小区负载进行移动台分配

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定