The mobile assignment was based on the transmit power of the link as well as cell load in the up link and down link calculation of base station location planning.
在基站布局规划的上、下行链路计算中基于链路发射功率与小区负载进行移动台分配。
The mobile assignment was based on the transmit power of the link as well as cell load in the up link and down link calculation of base station location planning.
在基站布局规划的上、下行链路计算中基于链路发射功率与小区负载进行移动台分配。
应用推荐