本文主要介绍双辊连铸中侧封技术的研究概况及新型侧封板耐火材料的研制情况。
This paper introduces the side dam technique for twin - roll continuous casting as well as refractory materials used for side dam.
试验证明组合式侧封板对提高铸轧过程稳定性和改善侧封板的使用寿命具有良好效果。
The results showed that the combined type of side dam is good to improve the process stability and prolong the operating life.
采用ANSYS有限元分析软件,分析了侧封板在铸轧过程中温度场和热应力场,由此解释侧封板产生裂纹的原因。
Using the ANSYS finite element analysis software, thermal analysis and thermal stress analysis of side dam in the strip casting process are carried out to explain the cause of side dam cracking.
水、电、气安装:安装在通风柜两侧的封板内。
Water, electricity gas installation: installed in the side boards of the draft cupboard.
水、电、气安装:安装在通风柜两侧的封板内。
Water, electricity gas installation: installed in the side boards of the draft cupboard.
应用推荐