钢管桩嵌固深度和波流要素是决定钢套箱受力状况的两个主要因素。
The embed depth and wave-stream elements of steel pipe piles are two main factors determining the bearing conditions of steel boxed cofferdam.
嵌岩桩的单桩竖向承载力理论上应由摩阻力、嵌固力、端承力组成。
Theoretically the single pile vertical bearing capacity of rock-socketed pile is composed of the frictional resistance, the socketed force and the end-bearing force.
悬臂吊梁的翼缘板和腹板在弯曲时因板边互相嵌固,对截面变形有约束作用。
Cantilever crane beam flange web in bending due to board edge are mutually embedded, a restriction on the cross section deformation.
轴向嵌固力对管道的横向位移有一定程度的影响,但在具体计算时往往被忽略。
Axial build-in force does has a certain effect on pipeline's transversely displacement but it is usually to be neglected in concrete calculation.
带地下室高层结构的嵌固端选择是否合理,直接影响到工程造价,结构的安全性等。
How to choose the partial fixing of the tall-building with basement is very important which will affect the cost, structure security and so on.
研究了在弹性支撑和弹性嵌固边界条件下,弹性矩形薄板固有振动特性的变化规律。
The changing pattern of the natural vibration characteristics of thin rectangular elastic plate is studied under the boundary conditions of elastic support and elastic embedding.
嵌固对接式伸缩装置耐久性明显优于其它类型伸缩装置,是因为其设计相对比较合理。
It is more rational of retractor device of built-in butted bridge, durability is obviously superior to the expansion joint of other types.
利用内边缘嵌固圆盘模型修正了支承点处的方程,并使用等效剪力实现了板边缘的位移协调条件。
A circular model with an inward fixed flange was used for the support points, with a general shear force introduced to realize the constraint conditions at the hinges.
推导出埋地管道的平衡微分方程,采用有限差分法分析并计算了轴向嵌固力对管道横向位移的影响。
By deriving balanced differential equation of buried pipeline, adopt finite difference method to analyze and calculate the effect of axial build-in force on pipeline transversely displacement.
钢骨柱部分伸进转换梁中,随着钢骨伸进转换梁中长度的增加,转换梁对钢骨的包裹嵌固作用增强。
The steel framed reinforced concrete column partially penetrates into the transfer girder, whose build-in effect to the column enhances with the increase of the penetrating length.
随着桩身嵌固深度的增大,桩身位移减小,当嵌固深度达到一定程度时,其变化对支护结构的影响很小。
Along with the increase of pile mounted depth, the pile displacement decreases. But when the mounted depth come to a certain value, the change of depth has little impact on retaining structure.
在工程抗震设计中,上部结构嵌固位置的确定是设计的出发点,而同一结构单元的不等高嵌固问题长期困扰设计人员。
The solid end of the structure is the starting point of seismic design, and the structure with varied solid ends is a puzzled problem for engineers.
以四川广元市某古建筑木结构为例,在考虑墙体嵌固作用的基础上,研究了汶川地震下古建筑的震害症状与地震响应状况。
An ancient wooden building with embedded masonry walls in Guangyuan city was taken as an example to study the damages of ancient buildings in Wenchuan Earthquake.
固装在电机主轴上之转子的外周缘上,按轴向开有多道与永磁体相匹配的嵌线槽,在嵌线槽内嵌置有循环绕组线圈。
There are axial slots matching with the permanent magnets on outer peripheral of the rotator on the main motor shaft. The circulation winding coil is embedded in the slots.
固装在电机主轴上之转子的外周缘上,按轴向开有多道与永磁体相匹配的嵌线槽,在嵌线槽内嵌置有循环绕组线圈。
There are axial slots matching with the permanent magnets on outer peripheral of the rotator on the main motor shaft. The circulation winding coil is embedded in the slots.
应用推荐