• 钢管深度要素决定受力状况两个主要因素

    The embed depth and wave-stream elements of steel pipe piles are two main factors determining the bearing conditions of steel boxed cofferdam.

    youdao

  • 竖向承载力理论上应阻力承力组成。

    Theoretically the single pile vertical bearing capacity of rock-socketed pile is composed of the frictional resistance, the socketed force and the end-bearing force.

    youdao

  • 悬臂翼缘板和腹板弯曲时互相截面变形约束作用。

    Cantilever crane beam flange web in bending due to board edge are mutually embedded, a restriction on the cross section deformation.

    youdao

  • 轴向嵌固管道横向位移一定程度的影响具体计算往往忽略。

    Axial build-in force does has a certain effect on pipeline's transversely displacement but it is usually to be neglected in concrete calculation.

    youdao

  • 地下室高层结构选择是否合理,直接影响到工程造价结构安全性

    How to choose the partial fixing of the tall-building with basement is very important which will affect the cost, structure security and so on.

    youdao

  • 研究了在弹性支撑弹性嵌固边界条件下,弹性矩形薄板振动特性变化规律

    The changing pattern of the natural vibration characteristics of thin rectangular elastic plate is studied under the boundary conditions of elastic support and elastic embedding.

    youdao

  • 对接伸缩装置耐久性明显优于其它类型伸缩装置,是因为其设计相对比较合理

    It is more rational of retractor device of built-in butted bridge, durability is obviously superior to the expansion joint of other types.

    youdao

  • 利用边缘圆盘模型修正支承方程,并使用等效剪力实现了板边缘的位移协调条件

    A circular model with an inward fixed flange was used for the support points, with a general shear force introduced to realize the constraint conditions at the hinges.

    youdao

  • 推导埋地管道平衡微分方程采用有限差分分析计算轴向嵌固管道横向位移影响

    By deriving balanced differential equation of buried pipeline, adopt finite difference method to analyze and calculate the effect of axial build-in force on pipeline transversely displacement.

    youdao

  • 部分伸进转换,随着钢骨伸进转换梁中长度增加,转换梁对钢骨的包裹作用增强

    The steel framed reinforced concrete column partially penetrates into the transfer girder, whose build-in effect to the column enhances with the increase of the penetrating length.

    youdao

  • 随着深度增大,桩身位移减小嵌固深度达到一定程度时,变化支护结构影响很小。

    Along with the increase of pile mounted depth, the pile displacement decreases. But when the mounted depth come to a certain value, the change of depth has little impact on retaining structure.

    youdao

  • 工程抗震设计,上部结构位置确定设计出发点,同一结构单元的不等高嵌固问题长期困扰设计人员

    The solid end of the structure is the starting point of seismic design, and the structure with varied solid ends is a puzzled problem for engineers.

    youdao

  • 四川广元市古建筑木结构,在考虑墙体作用基础上,研究汶川地震下古建筑的震害症状与地震响应状况。

    An ancient wooden building with embedded masonry walls in Guangyuan city was taken as an example to study the damages of ancient buildings in Wenchuan Earthquake.

    youdao

  • 电机主轴转子周缘上,按轴向多道磁体匹配线线槽内置有循环绕组线圈

    There are axial slots matching with the permanent magnets on outer peripheral of the rotator on the main motor shaft. The circulation winding coil is embedded in the slots.

    youdao

  • 电机主轴转子周缘上,按轴向多道磁体匹配线线槽内置有循环绕组线圈

    There are axial slots matching with the permanent magnets on outer peripheral of the rotator on the main motor shaft. The circulation winding coil is embedded in the slots.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定