电气装置安装工程施工及验收规范。
Code for construction and acceptance of electric device of. crane electrical equipment installation engineering.
混凝土搅拌的时间应符合《混凝土结构工程施工及验收规范》的规定。
Concrete mixing time should be in line with "concrete structural engineering and construction inspection norms".
本文主要介绍《混凝土结构工程施工及验收规范》的修订情况及主要修改内容。
This paper introduces the revision and main revised contents of the national code for construction and acceptance of concrete building structures.
着重分析了《混凝土结构工程施工及验收规范》(GB50204-92)在高强混凝土质量检验和验收中存在的问题。
The problems existing in the qualities checking and acceptance of high strength concrete structure(HSCS)using Code for Construction and Acceptance of Concrete Structures(GB50204-92)have been studied.
严格按照国家现行的《建筑安装工程施工及验收规范》和业主的质量标准施工,单位分项工程的质量评定合格率达到100%。
We will construct under the practicable state and quality requirement of client. The qualified percent of unit work up to 100%.
严格按照国家现行的《建筑安装工程施工及验收规范》和业主的质量标准施工,单位分项工程的质量评定合格率达到100%。
We will construct under the practicable state and quality requirement of client. The qualified percent of unit work up to 100%.
应用推荐