• 方法具有提高抛石体密实度,减少抛石体后期沉降施工简单等特点。

    This method bears some advantages, e. g. it will make the compactness of rubble-mould raised, prevent posttreatment from sinking, and make the construction, method simplified.

    youdao

  • 然而厚度不均层中进行冲孔灌注桩施工,在我国工程建设史上不多见

    But, construction of punched cast-in-situ piles in rubble-mound layer of uneven thickness is still rare in China's engineering history.

    youdao

  • 然而厚度不均层中进行冲孔灌注桩施工,在我国工程建设史上不多见

    But, construction of punched cast-in-situ piles in rubble-mound layer of uneven thickness is still rare in China's engineering history.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定