施工进度一直是水利水电工程施工所关心的问题。
The construction schedules of hydropower projects are always concerned problems in the execute process.
在铁路、公路及水利水电工程施工中被广泛使用。
It is widely used in the civil engineering for railway, highway, hydraulic facility and hydroelectric engineering construction.
水利水电工程施工过程中将对周围环境产生一定的不利影响。
Hydro project construction will impose a certain negative impact on environment.
五强溪水电工程施工期采用临时船闸通航,在国内是第一次。
A temporary ship lock was first applied for navigation during construction in China.
水电工程施工总布置时间、空间逻辑关系复杂,具有动态交互的特性。
Construction site layout of Hydropower engineering has the complicated logic relation of time and space, coming with the characteristic of dynamic interaction.
本文针对水电工程施工进度的优化及控制方法进行了理论分析与应用研究。
In this paper, optimization of hydropower project construction schedule and control methods of theoretical analysis and application.
砂石料场的规划选择和骨料加工方案是水电工程施工组织设计中的重要环节。
Planning selection of sand stocking yard and the aggregate processing program are important parts in the planning and the construction of hydraulics and electric power project.
国外某水利水电工程施工导流洞工程的地质条件十分特殊,各种地质结构面超常发育。
The construction diversion tunnel of a foreign project has special geologic conditions with various developed structural planes.
为了探求伤亡事故的发生机理,就有必要探索水利水电工程施工伤亡事故的致因特征。
In order to seek the happening mechanism of the injury and death accidents, it is necessary to seek the characteristics of the contributing factors of the accidents.
以水利水电工程施工高概率伤亡事故类别为出发点,探索水利水电工程施工高概率伤亡事故的致因。
Taking water resources & hydropower engineering as the example, the contributing factors of high injury and death accidents probability in this field are analyzed i…
本文就水利水电工程施工布置三维设计、重要施工设施厂址优选和布置方案优化三个方面进行了研究。
The thesis have a study on the three dimensional design of facility layouts the optimization choice of important facility and the scheme selection optimization of construction site layout.
本文分析了小型水利水电工程存在的主要问题,探讨了加强小型水利水电工程施工管理的优化策略。 。
This paper analyzes the small hydropower engineering, the main problems of ways to enhance the small hydropower engineering construction management of optimization strategy.
地质编录与测绘是重要水利水电工程施工地质工作的一项主要内容,一般地质编录测绘需要完成工程地质图图幅。
Geological recording and plotting is one of the main tasks in the construction geology of water conservancy projects.
水利水电工程施工过程中常常需要获得一些小范围的DTM数据,用于地形测绘、开挖形态监测及工程土石方量计算等。
In construction of hydroelectric project, small range DTM data are often needed for topographic surveying, mapping, excavated form detection, earthwork calculation and so on.
本文结合GIS在水利水电工程施工总布置可视化研究中的实际应用情况,建立了基于GIS的施工总布置可视化信息系统。
Considering existing circumstance of GIS application in Hydroelectric engineering construction layout, GIS-based construction layout visualization information system is built.
论述了危险源、危险因素、危险途径、危险点分布的定义与辨识方法,以水电工程施工作业系统为研究对象给出了辨识示例。
The author elaborated the dangerous source, the dangerous factor, the dangerous way, the hazard point distribution definition and the identification method, .
“追求卓越”的广西水电工程局企业精神在乐滩水电站工程施工中得到了充分体现。
"To pursue preeminence" is the enterprise spirit of Guangxi Hydroelectric construction Bureau, which has been fully displayed in the construction of Letan Hydropower Station Project.
“追求卓越”的广西水电工程局企业精神在乐滩水电站工程施工中得到了充分体现。
"To pursue preeminence" is the enterprise spirit of Guangxi Hydroelectric construction Bureau, which has been fully displayed in the construction of Letan Hydropower Station Project.