三联拱隧道段沉降、变形稳定,满足施工控制值的要求。
The deflections and settlements of three-connected-arch tunnel tend to be stable and meet the requirements of the construction control values.
以地表最大允许沉降值作为目标控制值,设计了一个用于制定隧道工程环境影响控制策略(施工技术措施)的动态优化模型。
With the allowable maximum ground settlement as target value, a dynamic optimization model is designed to draw up the strategy(technical measures) controlling the effect of tunnelling on environment.
以地表最大允许沉降值作为目标控制值,设计了一个用于制定隧道工程环境影响控制策略(施工技术措施)的动态优化模型。
With the allowable maximum ground settlement as target value, a dynamic optimization model is designed to draw up the strategy(technical measures) controlling the effect of tunnelling on environment.
应用推荐