在铁谢—神堤河段选择典型部位开展了土体物理力学特性试验,同时探讨了不同含水率状态下土体力学特性的变化规律,并对滩岸稳定性进行了初步分析。
It also discusses the variation law of mechanics feature of soil mass under different percent moisture content condition and makes initial analysis on the stability of floodplain and embankments.
溪两岸各有很宽的卵石滩。
Along each side of the stream, there were wide pebbled beaches.
护滩、保岸、促淤工程的范围按照批准的设计文件确定。
The area of riprap protection, protective revetments and silt arrester projects shall be defined in accordance with the approved design documents.
介绍了枸皮滩水电站右岸进场公路在施工中开挖形成的由娄山关群地层岩性组成的岩质高边坡破坏型式及处理措施。
The damaging way of the rock higher side comprising Loushanguaquan rock of right bank road of Goupitan power station formed in construction are described and some countermeasures are introduced.
介绍了龙滩水电工程右岸高边坡开挖中的爆破振动观测成果。
Blasting vibration observation result of the right bank's high slope of Longtan Hydropower Project is introduced.
三峡从这里到宜昌南津关,两岸悬崖绝壁,滩峡格间,水流湍急。
From here to Yichang Three Gorges Nanjinguan, the two sides Cliff, Beach Gap grid, water fast.
对沿江两岸河漫滩的分布特征、漫滩地貌、漫滩结构、漫滩基底结构、漫滩水文地质条件等进行了分析。
The distribution feature of the flood land along the river, its landform and structure, basal structures and hydrologic conditions are analyzed based on the data collected systematically.
本文介绍了二滩水电站工程导流隧洞右岸0+679剖面二维非线性有限元分析结果。
The two-dimensional nonlinear FEM results for Ertan project were introduced in this paper, which were analysed on the section 0+679m of the diversion tunnel on the right bank.
龙滩水电站右岸岸坡地质条件异常复杂,采用锚固洞塞的加固方案对边坡稳定进行治理。
Due to the very complex geological condition on the right bank of Long-tan hydropower station, the side slope has been treated with anchored-tunnel in order to get its stability.
龙滩水电站右岸岸坡地质条件异常复杂,采用锚固洞塞的加固方案对边坡稳定进行治理。
Due to the very complex geological condition on the right bank of Long-tan hydropower station, the side slope has been treated with anchored-tunnel in order to get its stability.
应用推荐