根据设计任务书中规定的总的下潜次数要求,最后给出了我国目前正在研制的7000米载人潜水器耐压球壳的疲劳载荷谱。
According to the requirement of the total diving number and the assumption of the distribution type, the fatigue load spectrum for the 7000m deep manned submersible is given.
作者根据电气产品耐压试验的工艺要求,研制出一套自动测控系统。
According to the process demands of the pressurization test on electrical products, the authors have developed an automatic measurement control system.
我们的高耐压管由碳素钢和不锈钢管组件制成,按照客户的要求来组装。
Carbon steel and stainless steel tube assemblies bent and formed to suit customers requirements.
以确保产品的耐压及安全性,最大程度满足客户要求。
To ensure that products and safety of pressure to maximize customer satisfaction.
并介绍目前交流耐压试验设备及试验要求,提出今后的研究方向。
The paper also introduces AC voltage test equipment, test requirements and future development.
为此,根据设备容量和试验等效性要求,论证采用变频串联谐振耐压试验的必要性、紧迫性和可行性。
As per the equipment capacity and test equivalence demands, this paper demonstrates the necessity, urgency and feasibility of applying variable-frequency series-resonant voltage withstand tests.
本文介绍了耐压测试的由来,CSA、UL的标准要求,耐压测试的测试设备以及测试方法。
This paper introduced the reason for performing dielectric voltage withstand test, test requirements of CSA and UL standards, dielectric voltage withstand tester, and test method.
本文通过对电子、电气设备安全标准的理解和耐压试验的工作实践,对试验中存在的判定电流设定、升压速度控制、耐压试验结果判定和设备性能要求等问题进行了探讨。
Based on the understanding to the safety standards of electronic and electrical equipment and on the practice, this paper discussed the issues on setting the trip current, speed of rising H.
这些要求集中体现在高耐压和低功耗上,这样,研究它的导通电阻和耐压成为必要。
These requirements embodied in the high voltage and low power consumption, so that the study of its resistance and the pressure become necessary.
由于光伏电池组件串联的数量受到太阳能电池板耐压和绝缘要求的限制,因此在光伏发电系统中一般采用DC/DC升压环节。
Pressure and insulation of solar panels will limit the number of photovoltaic modules in series, so DC/DC boosted link was used generally in photovoltaic power generation systems.
新安装或大修后的氢气系统必须做耐压试验、清洗和气密性试验,符合有关的检验要求,才能投入使用。
After a new installation or maintenance for hydrogen system, pressure test, flushing and gastight test must be done.
新安装或大修后的氢气系统必须做耐压试验、清洗和气密性试验,符合有关的检验要求,才能投入使用。
After a new installation or maintenance for hydrogen system, pressure test, flushing and gastight test must be done.
应用推荐