介绍了树脂砂车间工艺设计中选择原材料、设备和工艺布局时应注意的问题,并提出了一些合理化建议。
Problems of selection of raw materials and layout of equipment and process bewared in design of resin-bonded sand shops are introduced and rationalization proposal set forth.
负责车间及新生产线的布局设计。
Be responsible for layout of new workshop and new production line.
本文从工艺流程改进的角度研究设施与布局,对百家丽照明电器格栅车间进行改善设计。
In the study of facility layout, the paper designs the improvement of operations process for BGI lighting louver light workshop.
车间布局完全按照药品GMP生产要求设计,生产能力达20万箱。
The plants is disposed entirely according to GMP standard. The annual design capacity is over 200,000 sets.
从而验证了车间布局优化设计框架的指导作用,实现了发动机车间布局的优化设计。
Consequently, the availability of the frame is validated, and the optimal design of engine workshop layout is completed.
着重谈了相关图法设计固体制剂车间的工艺平面布局图。
Taking the solid preparations workshop for example, the paper analyses the theory on the basis of the different pharmaceutical workshop design by the production management theory.
着重谈了相关图法设计固体制剂车间的工艺平面布局图。
Taking the solid preparations workshop for example, the paper analyses the theory on the basis of the different pharmaceutical workshop design by the production management theory.
应用推荐