The part area adopts heat-bar treatment measure, to ensure permafrost areas iron tower foundations stability of Nachitai-Wudaoliang-Tuotuohe transmission line engineering.
为确保纳赤台—五道梁—沱沱河送电线路工程多年冻土地区铁塔基础地基的稳定,部分地段采用了热棒处理措施。
The part area adopts heat-bar treatment measure, to ensure permafrost areas iron tower foundations stability of Nachitai-Wudaoliang-Tuotuohe transmission line engineering.
为确保纳赤台—五道梁—沱沱河送电线路工程多年冻土地区铁塔基础地基的稳定,部分地段采用了热棒处理措施。
应用推荐