Through research, the problem was solved by adopting gravel pile method and setting reasonable dry beach length in front of the retaining dam.
通过设计研究采用碎石振冲桩法及在子坝前设置合理的干滩长度得以解决这些问题。
Through research, the problem was solved by adopting gravel pile method and setting reasonable dry beach length in front of the retaining dam.
通过设计研究采用碎石振冲桩法及在子坝前设置合理的干滩长度得以解决这些问题。
应用推荐