During the development iterations, a subset of stress-related and memory leak defects were removed before the formal system test entry time due to the early testing by the system test core team.
在开发迭代中,由于系统测试核心团队早期的测试,与压力相关的及内存泄漏缺陷的子集在正式的系统测试开始之前就被除掉了。
The most serious came just before its formal entry into the European Union in May 2004, the so-called “Annan plan”.
最正式的是不久前为加入欧盟(2004年5月)的“安南计划”。
The most serious came just before its formal entry into the European Union in May 2004, the so-called “Annan plan”.
最正式的是不久前为加入欧盟(2004年5月)的“安南计划”。
应用推荐