You can find the calculation on sheet 3, "Clusters".
您可以在表格3 “集群”中找到计算方法。
Cluster availability calculation on sheet 3: "Clusters".
表格3中的集群可用性计算:“集群”。
Cluster availability calculation on sheet 3: "Clusters", using override of calculated single node availability.
表格3中的集群可用性计算:“集群”,通过覆盖计算出来的单一节点可用性。
A calculation method of the flattening in sheet rolling deformation zone, using influence function, was derived.
采用影响函数法推导了薄板轧制时变形区内轧辊弹性压扁的计算式。
Finally, visualization program is developed, which can display the result of calculation, form computing sheet and plot construction drawings.
最后开发了可视化后处理程序,能显示计算结果、生成计算书并绘制施工图。
It mainly analyzes the design and internal structural force calculation for the sheet-pile retaining wall with load-relieving structures.
主要分析带有减载结构的板桩墙的设计及结构内力计算。
Based on the calculation model of vertical elastic grade beam, a method called virtual simply-supported beam method for design of sheet pile walls is introduced.
基于竖向弹性地基梁计算模型,提出了板桩结构计算的拟简支梁法。
The effect of initial geometrical imperfections on the stability of sheet space structure is a key to its design and calculation.
初始几何缺陷对板片结构体系稳定性的影响是板片结构计算和设计中的一个关键问题。
The blanking force calculation of blanking through inclined sheet metal is an outstuding subject.
倾斜板料冲裁的冲裁力计算是一个尚待研究的课题。
Automatically control the cutting speed to avoid over-burning according to plate thickness. Possible to edge cutting, offset cutting, to avoid wasting of meal sheet caused by calculation errors.
根据钢板厚度,在转角处可自动限速,有效防止过烧。支持边缘切割、偏移切割,对较厚的钢板可减少预热时间,并可避免因排料计算错误而造成的板材浪费。
By studying on the calculation of minimum laser energy and the deformation experiment, the paper provides exactly a theoretical foundation for controlling and predicting deformation of sheet metal.
最小激光能量的估算以及能量与板料变形的实验研究为板料变形的精确控制和预测提供了理论依据。
The exact length calculation of sheet metal structure work is the key to ensure better quality of product.
加工制造中,钣金结构件展开长度的精确计算是保证其得到较高的质量而不可忽视的重要环节。
This paper discusses the calculation method of pulp feed- in pipe of processing equipment for making GMT sheet with wet method.
本文讨论了GMT片材湿片成型装置中的进浆总管的计算方法。
The actual bearing capacity of the steel sheet cofferdam is determined through the theoretical calculation and the feasibility of this method is checked and examined by the actual construction.
通过理论计算确定钢板桩围堰的实际受力,并通过实际施工情况验证该方法的可行性。
Some questions about Lamb waves in nondestructive testing of thin metal sheet were discussed in this paper. The calculation formula of energy distribution along thickness of sheet was advanced.
对金属薄板兰姆波探伤中的一些问题进行了探讨,提出了能量沿板厚分布的计算公式。
Some questions about Lamb waves in nondestructive testing of thin metal sheet were discussed in this paper. The calculation formula of energy distribution along thickness of sheet was advanced.
对金属薄板兰姆波探伤中的一些问题进行了探讨,提出了能量沿板厚分布的计算公式。
应用推荐