• Based on the cable-stayed bridge using method of cantilever, the paper establishes the optimization model of construction phase with multi-objective and multi-constraint and gives the example.

    采用目标、多约束优化方法悬臂施工主梁的斜拉桥为例,建立了施工阶段的优化模型给出算例。

    youdao

  • The article describes the monitor objective, method, data analysis, regulating control measures and monitoring result in the course of cantilever concreting construction of the bridge.

    文章介绍了该桥悬臂浇筑施工过程监控目标方法数据分析调控措施监控效果

    youdao

  • In the long-span continuous rigid frame bridge construction process, usually use hanging basket-situ cantilever construction method of symmetry.

    大跨径连续刚构桥梁施工通常采用悬臂现浇对称施工

    youdao

  • In the long-span continuous rigid frame bridge construction process, usually use hanging basket-situ cantilever construction method of symmetry.

    大跨径连续刚构桥梁施工通常采用悬臂现浇对称施工

    youdao