This paper introduces the installation, test and case ground of GIS equipment, and puts forward some matters need attention in the construction process.
介绍了GIS设备的安装、试验和外壳接地,并指出了在施工过程中应注意的事项。
The engineering techniques, mating equipment, machines and tools, main constructing point, problems encountering and their resolved methods were introduced based on construction case study.
结合工程实例介绍了其施工工艺、配套设备、机具、施工要点、施工中遇到的问题及解决办法。
The case study of non-excavating directional drilling technique in power engineering is introduced, flow sheet, construction equipment and pipe installation of non-excavating technique are analysed.
结合河南省开洛高速公路非开挖铺设管线工程 ,简要分析了水平孔钻进弯曲机理 ,详细介绍了工程施工技术方法及效果。
The case study of non-excavating directional drilling technique in power engineering is introduced, flow sheet, construction equipment and pipe installation of non-excavating technique are analysed.
结合河南省开洛高速公路非开挖铺设管线工程 ,简要分析了水平孔钻进弯曲机理 ,详细介绍了工程施工技术方法及效果。