• In the closed circulation system of ash-sluicing water of coal-fired power plant, the scaling of the hydraulic ash transport pipes and the backwater pipes is the main problem that need to be solved.

    在燃煤电厂冲灰水闭路循环系统中,水力输灰管和回水管的结垢是所需解决的主要问题。

    youdao

  • In the closed circulation system of ash-sluicing water of coal-fired power plant, the scaling of the hydraulic ash transport pipes and the backwater pipes is the main problem that need to be solved.

    在燃煤电厂冲灰水闭路循环系统中,水力输灰管和回水管的结垢是所需解决的主要问题。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定