The cushion layer for the dam is constructed with the material prepared mainly with natural sandy gravel and mixed with proper amount of pebble and coarse sand.
大坝垫层料采用以天然砂砾料为主、掺入小石和粗砂以调整级配的方式生产。
Both saturated-unsaturated flow drainage experiment without the fine sand layer on the top of the coarse sand and air-water two-phase flow drainage experiment with the fine sand layer were performed.
进行了粗砂上部没有细砂层的均质砂柱的饱和-非饱和流排水实验以及粗砂上部存在细砂层的水气二相流排水实验。
The foundation of the dam for Dalong reservoir consists of the layer of medium-coarse sand with gravel, so it is difficult to be penetrated even by the high-power vibrator.
大隆水库大坝坝基为含卵砾中粗砂层,即使大功率振冲器也难以贯入。
The foundation of the dam for Dalong reservoir consists of the layer of medium-coarse sand with gravel, so it is difficult to be penetrated even by the high-power vibrator.
大隆水库大坝坝基为含卵砾中粗砂层,即使大功率振冲器也难以贯入。
应用推荐