• When construction began in 1969, Metsamor was a VVER 440, Model 230, an example of one of the earliest pressurized-water nuclear plant designs, developed by the Soviets between 1956 and 1970.

    1969年开始建设时,Metsamor用VVER440230反应堆,最早压水堆核电站的设计样板之一,是由苏联在1956年- 1970年间开发的。

    youdao

  • This paper introduces water pump house caisson construction of Huaneng Yuhuan Power Plant 1 000 MW unit, including geological conditions, structure and construction preparation, ordering and scheme.

    华能玉环电厂1 000MW机组工程雨水泵房沉井施工作介绍,包括:地质条件结构型式施工准备顺序、方案。

    youdao

  • Hydropower Station plant is an important part of the building, due to design or construction of negligence resulting in leakage of water, which impact the use of hydropower plant function and life.

    水电站厂房水电站建筑物重要组成部分设计施工方面疏忽而造成渗漏水影响水电站厂房的使用功能使用寿命

    youdao

  • Construction of the steel plant, steel, color steel, glazed tile roofs and steel plants and other water corrosion preventive effect.

    工厂建筑中的钢管钢板钢板、琉璃瓦屋顶结构厂房防水防腐防锈作用。

    youdao

  • If there exists shelter embankment at the water intake area of a power plant, the back silting at the place of intake and intake canal etc. must be solved before the construction of the power plant.

    电厂取水口掩护后,取水口、取水渠必须电厂建设之前予以解决。

    youdao

  • The treated wastewater of Fenjiu alcohol plant is reused in alcohol cooling, toilet washing, vine irrigating, construction water consumption and lawn watering etc.

    汾酒厂中水回用于冷却、住宅楼及厂区冲厕葡萄园浇地、基建用水、厂区绿化等用途。

    youdao

  • There are daily water supply 25 thousand tons of water plant with a daily water supply capacity of 5 million tons of new water plant is under construction.

    目前有日供水2.5万自来水一座,日供水量5万吨的自来水厂正在筹建中。

    youdao

  • Shequshi urban and suburban construction of the existing sewage treatment plant to the recycling of sewage facilities, and encourage renewable water for municipal, environmental, green water ;

    设区市城区近郊现有污水处理厂必须建设污水再生利用设施鼓励再生用于市政环卫、绿化用水;

    youdao

  • Main technical measures are as follow: in construction of ecology, implementing rational disposition of engineering measures and plant measures to control soil and water loss;

    其主要措施生态建设方面实施工程措施植物措施对位配置控制水土流失;

    youdao

  • The settling test of influent sample was conducted in Xi"an No. 4 Wastewater Treatment Plant under construction. The settling curve of SS is obtained under different water depths and retention time."

    通过拟建中的西安市第四污水处理厂初池入流污染物沉淀试验得到不同水深沉淀时间ss去除率曲线

    youdao

  • The settling test of influent sample was conducted in Xi"an No. 4 Wastewater Treatment Plant under construction. The settling curve of SS is obtained under different water depths and retention time."

    通过拟建中的西安市第四污水处理厂初池入流污染物沉淀试验得到不同水深沉淀时间ss去除率曲线

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定