That new construction project is behind schedule and over budget.
那个新的建筑工程已经进度落后,还超出预算。
It also discusses how to determine the project cost through analysis and calculation by (utilizing) the existing Budget Quota issued by the Construction Department.
并利用现有的部颁预算定额,通过分析计算,确定钢桥面铺装的工程造价。
Over time, the existing plan was eventually discarded, and the news that another architect was assigned to proceed with the construction project at a half of the budget was heard.
随着时间的推移,我们设计的平面最后被放弃了。最近我们听到的消息是另外一名建筑师被委任来推进这个建设项目,但只有一半的预算。
Establishes the construction drawing budget, definite project construction cost basis.
是编制施工图预算,确定工程造价的依据。
This paper discusses the effect on Construction Budget Consulting Organization in phase of project construction from four aspects.
从四个方面论述工程造价咨询单位在工程项目建设各阶段的作用。
Express information network construction budget into equipment new project budget and equipment renewal budget.
快递信息网络建设预算分为设备新建工程预算和设备更新换代预算。
The project design includes structural design, construction organization design and budget making.
工程设计包括:结构设计、施工组织设计和编制预算。
We can edit , print and save engineering budget and budgetary estimate , and maintain various construction project quota by this system.
我们使用该系统能方便完成工程概预算文件的编制、打印与归档保存,以及各类建筑定额的维护操作。
Project cost can be effectively controlled from the aspects of implementation, bidding, contract management, material and stuff price, construction supervision and project budget.
建设实施阶段,建设单位在招投标、合同管理、材料价格、施工管理(监理)、工程决算等几个方面,加强管理能够有效地控制工程造价。
Ahead construction project proceeding, an accurate budget is the base for an investor to make a correct decision.
在项目前期,准确的建设工程预算是投资者据以作出正确决策的基础。
The establishment, remuneration and the expenses of the staff of the preparation and construction office, when agreed by both parties, shall be covered in the project budget.
经甲乙双方同意后,工程预算应包括筹建工厂人员的编制、报酬及费用。
After approved upon by both parties, the establishment, remuneration and the expenses of the staff of the preparation and construction office shall be covered in the project budget.
筹建处工作人员的编制、报酬及费用,经甲乙双方同意后,列入工程预算。
"Light" construction strategy is a wise choice under tight project schedule and limited budget.
在紧张的项目进度和有限的预算下,“光”结构策略是一个明智的选择。
It's easy for project budget and can save 20% of the total charge compared to flange connecting, the construction don't need the power supply, oxygen, and fire.
便于工程预算较法兰式连接节约总工程费用地20%,施工无需电源、氧气、明火。
Now, there are more than 100 staff in the company, and about 80% of them are graduated with such majors as construction, structure, equipment, landscape, interior design, project budget.
公司目前有员工100余人,其中建筑、结构、设备、景观、室内、概算等各类专业人员占到80%。
Now, there are more than 100 staff in the company, and about 80% of them are graduated with such majors as construction, structure, equipment, landscape, interior design, project budget.
公司目前有员工100余人,其中建筑、结构、设备、景观、室内、概算等各类专业人员占到80%。
应用推荐