SVS is successfully applied to the analysis for the construction site layout for Qizong hydropower station, which validates the rationality and validity of the thought in this thesis.
并将其运用于其宗水电站施工总布置分析中,验证本文研究思路的合理性和有效性。
Organize the construction site layout planning, including water supply, power supply, processing site, warehouse and office space and other coordination work, solve all the problems of the site.
组织施工现场布置规划,包括供水、供电、加工场地、库房和办公休息区域等协调工作,解决工地一切协调问题。
The method of identification construction site layout conflict and the theoretical maneuver of solving this conflict facing to construction procedure are suggested in the thesis.
提出了面向施工过程的场地布置冲突识别方法以及解决冲突的策略。
Construction site layout of Hydropower engineering has the complicated logic relation of time and space, coming with the characteristic of dynamic interaction.
水电工程施工总布置时间、空间逻辑关系复杂,具有动态交互的特性。
Construction site layout of Hydropower engineering has the complicated logic relation of time and space, coming with the characteristic of dynamic interaction.
水电工程施工总布置时间、空间逻辑关系复杂,具有动态交互的特性。