This paper briefly introduces the design and applying situation of large-span belt passageway with continuous reinforced concrete frame.
简述了大跨度连续钢筋混凝土框架皮带走廊的设计与应用情况。
The support reaction will be reallocated after the appearance of bend and shear crack of a reinforced concrete continuous beam in the practice project.
在实际工程中,钢筋混凝土连续梁发生弯曲裂缝或剪切裂缝之后,支座反力将重新分配。
The cases of transverse cracking in the flange slabs of reinforced concrete continuous box girders of five urban flyovers or viaducts are introduced.
介绍了五座城市立交桥或高架桥的钢筋混凝土连续箱梁翼板横向开裂的情况。
The discrete variable optimum design of reinforced concrete continuous beams is discussed.
提出了钢筋混凝土连续梁的离散变量优化设计方法。
Ganjiang bridge in Jishui is the first box-arch bridge, which has continuous cast boards and girders construction on the arch and whose piers made from reinforced concrete are hollow.
吉水赣江大桥是江西省第一座拱上建筑采用现浇连续板梁式结构,且桥墩为钢筋混凝土空心墩的箱型拱桥。
The test results of eight composite and two normal reinforced concrete continuous beams under low cyclic loading and monotonic loading respectively are presented.
本文介绍八根迭合与两根整浇钢筋混凝土连续染,分别在单向荷载与低周反复荷载作用下的试验结果。
Some experiments show that the "imposed rotation method" derived from quadratic programming is a useful method in elastoplastic analysis of reinforced concrete continuous beams.
试验验证表明,用二次规划求解的强迫转角法是进行钢筋混凝土连续梁弹塑性分析的有效方法。
The reasons of cracking and large deformation on common reinforced concrete continuous beam bridge were discussed.
普通钢筋混凝土连续箱梁桥产生开裂和过大的变形等问题的产生原因进行了一定的探讨。
The moment modulation method is one kind of the design method for reinforced concrete continuous beams and frames considering redistribution of internal forces, which has been used for many years.
弯矩调幅法作为钢筋混凝土结构考虑塑性内力重分布分析方法中的一种,已在我国广为应用多年。
So the high effective pre-stressed reinforced concrete hollow slab with Medium strength spiral-continuous -ribs steel bar has a good prospect.
因此,以中强螺旋肋钢丝为受力筋的预应力空心板具有广阔美好的发展前景。
An optimized construction method of prestressed reinforced concrete continuous box girder by using a suspended wagon is introduced.
介绍一种优化的挂篮施工方法,并对该工法优化方面进行较详细的探讨和实施。
An optimized construction method of prestressed reinforced concrete continuous box girder by using a suspended wagon is introduced.
介绍一种优化的挂篮施工方法,并对该工法优化方面进行较详细的探讨和实施。
应用推荐