• There are many natural geographic factors to influence the design rainstorm flood peak flow of the rivers.

    河流在水期间达到最高点水位。也指涨达最高水位的洪水

    youdao

  • In the stage of planning silt dam system, the main task of hydrological computation is to design rainstorm, design flood and sediment load and other important characteristic parameters.

    淤地坝规划阶段水文计算主要任务计算设计暴雨量、设计洪水量输沙重要特征参数

    youdao

  • The formula of rainstorm strength is one of the basic basis for the planning and design of rain drainage system in cities and towns.

    暴雨强度公式城镇雨水排水系统规划设计基本依据之一

    youdao

  • Rainstorm design return period of one year, the ground water catchment time for 10 minutes.

    暴雨设计重现地面时间10分钟

    youdao

  • Rainstorm design return period of one year, the ground water catchment time for 10 minutes.

    暴雨设计重现地面时间10分钟

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定